Summary of the operations (Jan, 2001) [To Jananese page]@[Go to home]


January 15, 2001

  • Machine study
  • Vertical Insutability.

  • January 16, 2001

  • Machine study
  • Streek Camera

  • January 17, 2001

  • Confirmation of light beam position in each beam line during 9:00 am to 1:00 pm.
  • A machine study for adjusting BPM conditions is carring out.

  • January 18, 2001

  • Study of RF-Q

  • January 19, 2001

  • User run
  • Beam injection started at 8:00 a.m. We permitted to open the beam shutters at 9:00 a.m.
  • Operation status
  • Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    10:00 a.m.

    442.0 mA

    41.8 hours

    1108.3 A*minutes

    15.7 nPa

    574.4 A*hours


    January 20, 2001

  • User run
  • Beam injection started at 9:06 a.m. We permitted to open the beam shutters at 9:22 a.m.
  • Operation status
  • Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:22 a.m

    450.5 mA

    41.7 hours

    1126.2 A*minutes

    15.1 nPa

    582.9 A*hours


    January 21, 2001

  • User run
  • Beam injection started at 9:02 a.m. We permitted to open the beam shutters at 9:20 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:20 a.m

    450.5 mA

    41.1 hours

    1110.7 A*minutes

    15.5 nPa

    591.5 A*hours


  • January 22, 2001

  • Machine study
  • Beam Based Alignment Study

  • January 23, 2001

  • Bonus Run
  • Beam injection started at 8:01 a.m. We permitted to open the beam shutters at 8:19 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    8:19 a.m

    450.0 mA

    42.5 hours

    1146.2 A*minutes

    14.5 nPa

    608.1 A*hours

  • eam injection started at 7:01 p.m. We permitted to open the beam shutters at 7:37 p.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    7:37 a.m

    450.4 mA

    44.5 hours

    1202.6 A*minutes

    12.9 nPa

    611.8 A*hours


  • January 24, 2001

  • User run
  • Beam injection started at 9:03 a.m. We permitted to open the beam shutters at 9:28 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:28 a.m

    449.4 mA

    44.2 hours

    1191.7 A*minutes

    14.5 nPa

    617.3 A*hours


  • January 25, 2001

  • User run
  • Beam injection started at 9:03 a.m. We permitted to open the beam shutters at 9:21 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:21 a.m

    450.4mA

    45 hours

    1215.5 A*minutes

    14.7 nPa

    625.2 A*hours


  • January 26, 2001

  • User run
  • Beam injection started at 9:03 a.m. We permitted to open the beam shutters at 9:27 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:27 am

    449.9mA

    45.9 hours

    1239.7 A*minutes

    15.2 nPa

    634.7 A*hours


  • January 27, 2001

  • User run
  • Beam injection started at 9:02 a.m. We permitted to open the beam shutters at 9:21 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:21 am

    450.4 mA

    44.4 hours

    1200.7 A*minutes

    15.2 nPa

    643.4 A*hours

  • The electricity was cut off at 6:31 PM. We had a beam dump . The beam was injected again.
  • User run
  • Beam injection started at 8:23 PM. We permitted to open the beam shutters at 9:25 PM.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:25 AM

    448.0 mA

    43.4 hours

    1166.2 A*minutes

    15.3 nPa

    647.4 A*hours


  • January 28, 2001

  • User run
  • Beam injection started at 9:05 a.m. We permitted to open the beam shutters at 9:28 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:28 am

    450.2 mA

    44.8 hours

    1211.3 A*minutes

    16.1 nPa

    652.2 A*hours


  • January 29, 2001

  • Study of SR interometer
  • Study of RF phase modulation.

  • January 30, 2001

  • Machine study.
  • Vacuum conditioning is under way.
  • Bonus Run
  • Beam injection started at 8:00 a.m. We permitted to open the beam shutters at 8:19 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    8:19 a.m

    450.7 mA

    42.5 hours

    1134.9 A*minutes

    13.7 nPa

    665..6 A*hours


  • January 31, 2001

  • User run
  • Beam injection started at 9:03 a.m. We permitted to open the beam shutters at 9:25 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:25 am

    449.9 mA

    43.4 hours

    1171.4 A*minutes

    14 nPa

    674.5 A*hours