  • User run
  • Beam injection started at 9:05 a.m. We permitted to open the beam shutters at 9:25 a.m.
  • Operation status

    Time

    Beam current

    Beam lifetime

    I*tau

    Average pressure

    Integrated current

    9:25

    200.4 mA

    47.2 hours

    567.7 A*minutes

    20.6 nPa

    904.8 A*hours

  • The ring operation was stopped at 9:00 a.m,Mar 9,2001.